General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Eglinton Avenue & Laird Drive Toronto, Ontario Canada | ||||||||||
Coordinates | 43°42′48″N 79°21′54″W / 43.71333°N 79.36500°W | ||||||||||
Platforms | Centre platform | ||||||||||
Tracks | 2 | ||||||||||
Connections | TTC buses | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
History | |||||||||||
Opening | 2024[1] | ||||||||||
Services | |||||||||||
|
Laird is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system.[2] It is located in the Leaside neighbourhood in East York at the intersection of Laird Drive and Eglinton Avenue. It is scheduled to open in 2024.[1]
This station's entrances are both on the south side of Eglinton. The main entrance is at the southwest corner of the Laird Drive intersection replacing a small strip mall and the secondary one is east of that in the Leaside Centre parking lot, just beyond the Pier 1 Imports store.[3]
On the east side of the station, there is a third track between the eastbound and westbound tracks, either to store a train or to allow a train to change direction due to an emergency or a change in service. On the west side of the station, there is a diamond crossover.[4][5] Laird station is the easternmost underground station in the main tunnel; the line will emerge onto Eglinton about 250 metres (820 ft) east of Brentcliffe Drive and change to predominantly on-street operation in a dedicated right-of-way in the centre of the street east to Kennedy station.
Destinations include the many commercial establishments to the southeast: Leaside Centre, the SmartCentres on Laird, and the Leaside Business Park on Eglinton.
Ontario Premier Kathleen Wynne officiated at the ground-breaking for the station on June 30, 2016.[6]
The main entrance will be built on the site of the strip mall on the southwest corner. Across Laird to the east, a second entrance will be built on the parking lot of the RioCan-owned Laird Centre on the southeast corner.
GovOn2016-06-30
was invoked but never defined (see the help page).