Our website is made possible by displaying online advertisements to our visitors.
Please consider supporting us by disabling your ad blocker.

Responsive image


Line 21 (Shanghai Metro)

Line 21
 21 
Overview
Other name(s)Line 24 (between 2014 and 2016)
Native name上海地铁21号线
StatusUnder construction
LocalePudong, Shanghai
Termini
Connecting lines 2   6   9   11   12   13   14 
Stations28
Websitewww.shmetro.com
Service
TypeUrban rail transit in China Rapid transit
SystemShanghai Metro Shanghai Metro
Operator(s)Shanghai Maglev Development Co., Ltd.
Depot(s)Liuchen Road Depot
Rolling stockClass A 6-car trains
History
CommencedJanuary 4, 2022 (2022-01-04)
Planned opening2026 (2026)
Technical
Track length48 km (30 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Operating speed100 km/h (62 mph)

Line 21 will be a future subway line on the Shanghai Metro. It will run in a north–south direction through Pudong, connecting Gaohang in Waigaoqiao to the Disney Resort. The first phase will be about 28 km (17 mi) long with 10 stations.[1] Stations will have passing loops to allow for express and local stopping patterns.[1]

The line was announced by the Municipal government in 2016.[2][3] Previous plans in 2014 designated the Disney Resort — Guanglan Road section as Line 24.

  1. ^ a b "上海轨道交通21号线(一期)环评报批前公示-基础工程网". www.jcgcw.com. Retrieved 2022-01-17.
  2. ^ "Shanghai Municipal Government: City mulls plan for nine more Metro projects". publicnow.com. 20 April 2016. Retrieved 24 April 2016.
  3. ^ 上海市轨道交通近期建设规划(2017-2025)出炉 规划有9条线路 (in Chinese). Shanghai Municipal Government. 19 April 2016. Retrieved 24 April 2016.

Previous Page Next Page






Ligne 21 du métro de Shanghai French 上海轨道交通21号线 Chinese

Responsive image

Responsive image