Our website is made possible by displaying online advertisements to our visitors.
Please consider supporting us by disabling your ad blocker.

Responsive image


Pingdi Liulian station

Pingdi Liulian

坪地六联
Shenzhen Metro
Alighting platform
Chinese name
Simplified Chinese坪地六联
Traditional Chinese坪地六聯
Transcriptions
Standard Mandarin
Hanyu PinyinPíngdì Liùlián
Yue: Cantonese
JyutpingPing4 Dei6 Luk6 Lyun4
General information
LocationLiulian Village (六联村), Pingdi Subdistrict
Longgang District, Shenzhen, Guangdong
China
Coordinates22°47′23″N 114°19′02″E / 22.7897°N 114.3172°E / 22.7897; 114.3172
Operated bySZMC (Shenzhen Metro Group)
Line(s)     Line 3
Platforms2 (2 side platforms)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
History
Opened28 December 2024 (2024-12-28)
Services
Preceding station SZM Shenzhen Metro Following station
Fuping Line 3 Terminus

Pingdi Liulian station (simplified Chinese: 坪地六联; traditional Chinese: 坪地六聯; pinyin: Píngdì Liùlián Zhàn; Jyutping: Ping4 Dei6 Luk6 Lyun4 Zaam6) is a station on Line 3 of Shenzhen Metro. It opened on December 28, 2024,[1] and is located underground in Pingdi Subdistrict in Longgang District. It is the northern terminus of the line.[2]

The station is part of the fourth phase of Line 3 (East Extension).[3][4]

  1. ^ "定了!深圳地铁13号线南段明日开通" [It’s settled! The southern section of Shenzhen Metro Line 13 will open tomorrow]. Shekou News (in Simplified Chinese). 2024-12-27. Retrieved 2025-01-19.
  2. ^ "深圳地铁3号线东延线近期开建,延至低碳城和坪地" [Shenzhen Metro Line 3 East Extension Line will be built soon, extending to Low Carbon City and Pingdi]. Shenzhen Business Daily (in Simplified Chinese). 2020-07-28. Archived from the original on 2020-10-08. Retrieved 2025-01-19.
  3. ^ "深圳地铁集团党委书记、董事长辛杰参加《民心桥》节目听众问题的落实情况" [The implementation of the audience's questions raised by Xin Jie, Party Secretary and Chairman of Shenzhen Metro Group, on the "Bridge of People's Hearts" program]. Shenzhen Government Online (in Simplified Chinese). 2020-09-08. Archived from the original on 2020-10-09. Retrieved 2025-01-19.
  4. ^ "深圳地铁3号线东延"可研"获批!开工在即!建设工期为5年" [Shenzhen Metro Line 3 East Extension "Feasibility Study" approved! Construction is about to start! The construction period is 5 years]. Shenzhen News Network (in Simplified Chinese). 2020-07-24. Archived from the original on 2020-10-09. Retrieved 2025-01-19.

Previous Page Next Page






坪地六联站 Chinese

Responsive image

Responsive image