Our website is made possible by displaying online advertisements to our visitors.
Please consider supporting us by disabling your ad blocker.

Responsive image


Xinsheng station

Xinsheng

新生
Shenzhen Metro
Platform calligraphy
Chinese name
Chinese新生
Transcriptions
Standard Mandarin
Hanyu PinyinXīnshēng
Yue: Cantonese
JyutpingSan1 Saang1
General information
LocationIntersection of Longgang Avenue (龙岗大道) and Xincheng Road (新城路)
Longgang District, Shenzhen, Guangdong
China
Coordinates22°45′04″N 114°16′42″E / 22.750989°N 114.278261°E / 22.750989; 114.278261
Operated bySZMC (Shenzhen Metro Group)
Line(s)     Line 3
Platforms4 (2 island platforms)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
History
Opened28 December 2024 (2024-12-28)
Services
Preceding station SZM Shenzhen Metro Following station
Liyuan Line 3 Pingxi

Xinsheng station (Chinese: 新生; pinyin: Xīnshēng Zhàn; Jyutping: San1 Saang1 Zaam6) is a station on Line 3 of Shenzhen Metro. It opened on December 28, 2024,[1] and is located underground in Longgang District.[2]

The station is part of the fourth phase of Line 3 (East Extension).[3][4]

  1. ^ "定了!深圳地铁13号线南段明日开通" [It’s settled! The southern section of Shenzhen Metro Line 13 will open tomorrow]. Shekou News (in Simplified Chinese). 2024-12-27. Retrieved 2025-01-11.
  2. ^ "深圳地铁3号线东延线近期开建,延至低碳城和坪地" [Shenzhen Metro Line 3 East Extension Line will be built soon, extending to Low Carbon City and Pingdi]. Shenzhen Business Daily (in Simplified Chinese). 2020-07-28. Archived from the original on 2020-10-08. Retrieved 2025-01-11.
  3. ^ "深圳地铁集团党委书记、董事长辛杰参加《民心桥》节目听众问题的落实情况" [The implementation of the audience's questions raised by Xin Jie, Party Secretary and Chairman of Shenzhen Metro Group, on the "Bridge of People's Hearts" program]. Shenzhen Government Online (in Simplified Chinese). 2020-09-08. Archived from the original on 2020-10-09. Retrieved 2025-01-11.
  4. ^ "深圳地铁3号线东延"可研"获批!开工在即!建设工期为5年" [Shenzhen Metro Line 3 East Extension "Feasibility Study" approved! Construction is about to start! The construction period is 5 years]. Shenzhen News Network (in Simplified Chinese). 2020-07-24. Archived from the original on 2020-10-09. Retrieved 2025-01-11.

Previous Page Next Page






新生站 (深圳) Chinese

Responsive image

Responsive image