Our website is made possible by displaying online advertisements to our visitors.
Please consider supporting us by disabling your ad blocker.

Responsive image


Downsview Park station

Downsview Park
General information
Location1212 Sheppard Ave West,
Toronto, Ontario
Canada
Coordinates43°45′13″N 79°28′43″W / 43.75361°N 79.47861°W / 43.75361; -79.47861
Operated byToronto Transit Commission
PlatformsCentre platform
Tracks2
Bus routes
  •  84  Sheppard West
  •  101  Downsview Park
  •  106  Sentinel
  •  107  York University Heights
  •  108  Driftwood
  •  384   Sheppard West
  •  984A  Sheppard West Express
Construction
ParkingNone
AccessibleYes
ArchitectAedas
Architectural stylePostmodern architecture
Other information
Station codeGO Transit: DW
WebsiteOfficial station page
History
OpenedDecember 17, 2017 (2017-12-17)[1]
Passengers
2023–2024[2]5,618
Rank66 of 70
Services
Preceding station Toronto Transit Commission Following station
Finch West
towards Vaughan
Line 1 Yonge–University Sheppard West
towards Finch
Location
Map

Downsview Park is a rapid transit station on Line 1 Yonge–University of the Toronto subway and a commuter rail station on the Barrie commuter rail line of GO Transit. Subway service began on December 17, 2017, and GO Train service began on December 30, 2017.[3] Downsview Park station is a fully integrated multi-modal transit facility serving both transit lines. This is in contrast to other interchanges between TTC subway and GO Transit rail lines, which have separate structures for each agency.

TTC ridership statistics for 2018 showed that Downsview Park was the least used station on the heavy-rail subway system, displacing Bessarion on Line 4 Sheppard. However, by 2022, ridership at Downsview Park had increased to 8,845 riders per weekday versus 4,269 for Bessarion, again making Bessarion station the least used.[4]

  1. ^ Beattie, Samantha; Spurr, Ben (December 16, 2017). "After delays, cost overruns, and tragedy, a subway to Vaughan is complete". Toronto Star. Archived from the original on December 17, 2017. Retrieved December 17, 2017.
  2. ^ "Subway ridership, 2023–2024" (PDF). Toronto Transit Commission. Retrieved November 12, 2024. This table shows the typical number of customer-boardings made on each subway line and the number of customers travelling to and from each station platform on a typical weekday in Sep 2023–Aug 2024.
  3. ^ "More Barrie GO Trains". GO Transit. Archived from the original on December 13, 2017.
  4. ^ "Subway ridership, 2022" (PDF). Toronto Transit Commission. Retrieved May 4, 2024. This table shows the typical number of customer-trips made on each subway on an average weekday and the typical number of customers travelling to and from each station platform on an average weekday.

Previous Page Next Page






Downsview Park (Toronto Subway) German ایستگاه داونزویو پارک FA Downsview Park (métro de Toronto) French 다운즈뷰파크역 Korean 登士維公園站 Chinese

Responsive image

Responsive image