Our website is made possible by displaying online advertisements to our visitors.
Please consider supporting us by disabling your ad blocker.

Responsive image


Seaford station (LIRR)

Seaford
Entrance to the Seaford station's station house, at ground level, beneath the tracks and platform
General information
LocationSunrise Highway & Jackson Avenue
Seaford, New York
Coordinates40°40′33″N 73°29′11″W / 40.67573°N 73.486454°W / 40.67573; -73.486454
Owned byLong Island Rail Road
Line(s)Montauk Branch
Distance27.7 mi (44.6 km) from Long Island City[1]
Platforms1 island platform
Tracks2
ConnectionsLocal Transit Nassau Inter-County Express: n54
Construction
ParkingYes
Bicycle facilitiesYes
AccessibleYes
Other information
Fare zone7
History
OpenedMay 26, 1899 (1899-05-26)
Rebuilt1966–1967, 2007–2009
ElectrifiedMay 20, 1925
750 V (DC) third rail
Passengers
2012—20143,796[2]
Rank32 of 125
Services
Preceding station Long Island Rail Road Following station
Wantagh Babylon Branch Massapequa
toward Babylon
     Montauk Branch does not stop here
Former services
Preceding station Long Island
Rail Road
Following station
Wantagh Montauk Division Massapequa
toward Montauk
Location
Map

Seaford is a station on the Babylon Branch of the Long Island Rail Road. It is officially located at the intersection of Sunrise Highway (NY 27) and Jackson Avenue in Seaford, New York – although parking areas stretch beyond Washington Avenue east of this corner, and west towards the interchange with the Seaford–Oyster Bay Expressway (NY 135).

Westbound trains serving the Seaford station typically terminate at Penn Station or Grand Central, and eastbound trains terminate at Babylon.

  1. ^ Long Island Rail Road (May 14, 2012). "TIMETABLE No. 4" (PDF). p. IV. Retrieved August 4, 2022.
  2. ^ "2012-2014 LIRR Origin and Destination Report : Volume I: Travel Behavior Among All LIRR Passengers" (PDF). Metropolitan Transportation Authority. August 23, 2016. PDF pp. 15, 197. Archived (PDF) from the original on July 17, 2019. Retrieved March 29, 2020. Data collection took place after the pretest determinations, starting in September 2012 and concluding in May 2014. .... 2012-2014 LIRR O[rigin and ]D[estination] COUNTS: WEEKDAY East/West Total By Station in Numerical Order

Previous Page Next Page








Responsive image

Responsive image