Line 3 (Beijing Subway)

Line 3
A SFM86 type train leaving Dongsi Shitiao station of Line 3
Overview
Other name(s)M3 (planned name)
StatusOperational
Termini
Stations10 (Phase I)[1]
Service
TypeRapid transit
SystemBeijing Subway
Rolling stockType A, 4-car / 8-car[2]
History
OpenedDecember 15, 2024 (2024-12-15)[3]
Technical
Line length14.7 km (9.1 mi) (Phase I)[1]
CharacterUnderground[4]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (50 mph)
Route map

planned extension to Tiancun
Dongsi Shitiao
Left arrow inner – outer Right arrow
Workers' Stadium
Tuanjiehu
Left arrow inner – outer Right arrow
Chaoyang Park
connection canal between Shuidui Lake and Honglingjin Lake
Shifoying
Chaoyang railway station
Yaojiayuan
Dongbanan
Dongba
Ba river
Dongbabei
Dongba depot
Beixiao river
Guanzhuang Lu Xikou
Louzizhuangqiaoxi
Louzizhuang
Gaoxinzhuang
Caogezhuangbei

Line 3 of the Beijing Subway (Chinese: 北京地铁3号线; pinyin: běijīng dìtiě sān hàoxiàn) is a rapid transit line in Beijing, China. It opened on December 15, 2024.[1][3] It is colored rose red in system maps.[2][5]

  1. ^ a b c "北京新开3条(段)地铁线 主要火车站机场地铁全覆盖". December 16, 2024. 地铁3号线一期(东四十条站—东坝北站)东西向串联多个主要居住和功能区,运营里程14.7公里
  2. ^ a b "北京3号线首列车在河北京车智能制造基地下线". July 6, 2022. Archived from the original on July 10, 2022.
  3. ^ a b "官宣!本周日北京新开3条(段)地铁线,朝阳站枢纽同步开通". December 12, 2024.
  4. ^ "北京地铁3号线一期工程首站封顶". Xinhuanet. Retrieved November 12, 2020.
  5. ^ "《公共交通客运标志 第2部分:城市轨道交通(征求意见稿)》". October 7, 2023. Archived from the original on April 22, 2023.

Line 3 (Beijing Subway)

Dodaje.pl - Ogłoszenia lokalne