Line 5 (Chongqing Rail Transit)

Line 5
Overview
Native name重庆轨道交通5号线
StatusOperational
Line number5
LocaleChongqing, China
Termini
Stations31
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2017 (2017-12-28)
Technical
Line length48.7 km (30.3 miles)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC overhead line
Operating speed120 km/h (75 mph) (Peak)
Route map

Yuegangbeilu
Shizishan depot
Yuegang Avenue
Chunxuan Avenue
Central Park West
Lujiagou
Ganyue Avenue
Yuhegou
The EXPO Garden Center
3
Danhe
Huxiajie
Chongguang
Hemulu
Renhe
Dazhulin depot
Xingfu Square
Ranjiaba
Dalongshan
Dashiba
Zhongshutuo
Hongyancun
Xietaizi
Shiqiaopu
Shixinlu
Bashan
Fengxilu
Chongqing W
Railway Station
Huayan Temple
Huachenglu
Banshan
Zhongliangshan
Jinjianlu
Jin'aoshan
Huayan Center
Zhongliangshan depot
Jiangtiao line
Tiaodeng
Shilinsi
DC 1.5 kV
AC 25 kV
Jiulongyuan
Shuangfu
Xiangtang
Shuangfu Depot
Jiangjin High-speed Railway
Shengquansi
Jijiang
Dingshan
=
Virtual interchange: transport
card only, re-entry required.

Line 5 of CRT is a rapid transit line in Chongqing, China, which opened on 28 December 2017.[1]

  1. ^ "重庆市主城形成多层次立体交通体系". May 16, 2017.

Line 5 (Chongqing Rail Transit)

Dodaje.pl - Ogłoszenia lokalne