This article needs to be updated. The reason given is: Hengqin Line is opened.(December 2024) |
You can help expand this article with text translated from the corresponding article in Chinese. (April 2021) Click [show] for important translation instructions.
|
Macau Light Rapid Transit | |||
---|---|---|---|
Overview | |||
Native name |
| ||
Owner | Macao Light Rapid Transit Corporation, Limited | ||
Area served | |||
Locale | Macau | ||
Transit type | People mover | ||
Number of lines | 3 | ||
Number of stations | 15 | ||
Website | www | ||
Operation | |||
Began operation | 10 December 2019 | ||
Operator(s) | Macao Light Rapid Transit Corporation, Limited(MLM) | ||
Technical | |||
System length | 14.1 km (9 mi) | ||
Track gauge | N/A - rubber-tired wheels | ||
|
Macau Light Rapid Transit | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese name | |||||||||||
Traditional Chinese | 澳門輕軌系統 | ||||||||||
Simplified Chinese | 澳门轻轨系统 | ||||||||||
| |||||||||||
Portuguese name | |||||||||||
Portuguese | Metro Ligeiro de Macau |
The Macau Light Rapid Transit (MLRT, Chinese: 澳門輕軌系統; Portuguese: Metro Ligeiro de Macau, MLM) is a mass transit system in Macau and the first railway system of the city. The first phase of the project's construction began in February 2012, and the first section of the Taipa line was opened to the public on 10 December 2019.[1] Barra extension of the line and two new branches of Seac Pai Van and Hengqin opened in 2023 and 2024.
MTR (Macau), a wholly-owned subsidiary of MTR, had operated and maintaining the MLRT under the operations and maintenance assistance services (O&M Contract), until it expires in December 2024. Macao Light Rapid Transit Corporation, Limited (MLM) is directly responsible for the operations and maintenance assistance services of the MLRT from 1 April 2024. [2]
The Taipa Line, being the first line of the light rail system to be opened, runs from Barra station to Taipa Ferry Terminal station, with a total length of 12.5 km (7.8 mi) and a total of 13 stations; the depot project is still under construction. Overall, the Taipa Line has been reported to have cost around 10 billion patacas.[3] Once completed, the entire system is expected to serve the Macau Peninsula, Taipa and Cotai, serving major border checkpoints such as the Border Gate, the Outer Harbour Ferry Terminal, the Lotus Bridge border and the Macau International Airport.
Free LRT Trips
was invoked but never defined (see the help page).